Heating Plant Replacement, 33 Bloor Street
Toronto, Ontario
August 26, 2025
Going beyond the status quo to create and preserve value
Like many buildings of its time, in 2024, 33 Bloor’s heating system might have lasted another year or two, but the risk of urgent
mid-winter issues was looming. Instead of just replacing the system to maintain the status quo, the property manager saw this as an opportunity to create and preserve asset value.
Case Study Team
- Project Owner
- Lorem ipsum dolor
- LEED / Sustainability Consultant
- Lorem ipsum dolor sit amet cursus
- Mechanical Engineer
- Lorem ipsum dolor
- Electrical Engineer
- Lorem ipsum dolor
- Commissioning Authority
- Lorem ipsum dolor
- CaGBC members involved
- Lorem ipsum dolor
Curabitur metus elit, condimentum in enim eget, imperdiet imperdiet sem. Mauris imperdiet dapibus dolor sit amet imperdiet. Morbi eu sapien purus. Vestibulum non dolor erat. Nulla facilisi. Praesent ut eleifend sapien, eget finibus mauris. Donec varius laoreet sem id scelerisque. Mauris a magna libero. Ut vitae sem quam. Ut feugiat congue nibh ac mollis. Pellentesque quis purus est. Phasellus eget ligula eros.
Sed tincidunt malesuada posuere. In hac habitasse platea dictumst. Integer nisi arcu, maximus lacinia nibh sit amet, interdum sagittis nunc. Nam condimentum urna vel erat mollis malesuada. Donec lacinia enim massa, at elementum sapien facilisis sit amet. Donec a ligula in lectus cursus volutpat. Quisque pharetra sagittis posuere. Donec sed velit luctus, pellentesque erat nec, blandit dui.
